Micron Technology Logo

Micron Technology

Global Facilities Construction Schedule Control Manager

Reposted 24 Days Ago
Be an Early Applicant
In-Office
Singapore, SGP
Senior level
In-Office
Singapore, SGP
Senior level
The role involves managing construction project scheduling and risk, ensuring compliance with global processes, and integrating project controls and reporting across various teams for large-scale construction projects.
The summary above was generated by AI
Our vision is to transform how the world uses information to enrich life for all.
Join an inclusive team passionate about one thing: using their expertise in the relentless pursuit of innovation for customers and partners. The solutions we build help make everything from virtual reality experiences to breakthroughs in neural networks possible. We do it all while committing to integrity, sustainability, and giving back to our communities. Because doing so can fuel the very innovation we are pursuing.
Responsibilities
  • Accountable for driving compliance with defined Global processes and procedures across all construction project activities
  • Develops and maintains comprehensive documentation, including process frameworks, audit reports, and project controls guidelines, ensuring accuracy, clarity, and accessibility for all project stakeholders
  • Serve as the primary interface between line planning, engineering, construction, procurement, and finance teams on all scheduling and risk matters
  • Partner with the BIM team to ensure 4D BIM models are aligned with construction schedules and updated throughout the project lifecycle
  • Collaborate with estimating teams on baseline schedule and cost integration
  • Project Control scope includes the following but not limited to:
  • Lead Scheduling
    • Develop, maintain, and manage fully integrated master project schedules using industry-standard scheduling tools (Primavera P6, Microsoft Project)
    • Lead 4D BIM scheduling by integrating 3D models with project schedules to visualize construction sequences and optimize workflow planning using tools such as Autodesk Navisworks Bentley Synchro, or equivalent
    • Establish and enforce schedule governance standards, including WBS structure, activity coding, logic relationships, baseline management, and schedule health metrics
    • Conduct regular Critical Path Method (CPM) analysis, float analysis, and schedule variance reporting
    • Drive look-ahead scheduling (2-week, 4-week) in collaboration with field teams and contractors
    • Coordinate schedule integration with procurement, design, construction, and commissioning teams
    • Perform schedule compression / acceleration analysis and evaluate time-cost tradeoffs using generative scheduling techniques
  • Risk Management :
    • Lead the development and maintenance of the project risk register, including qualitative and quantitative risk assessments
    • Execute probabilistic schedule risk analysis using Oracle Primavera Risk Analysis (PRA) - including Monte Carlo simulations, tornado chart analysis, and confidence level reporting (P50/P80/P90)
    • Identify and quantify risk drivers, model mitigation strategies, and recommend contingency levels for schedule and cost
    • Facilitate risk workshops with project stakeholders to identify, assess, and prioritize risks
    • Develop and track risk response plans and mitigation actions
    • Perform "What-If" scenario analysis to test impacts of risk events on schedule and cost outcomes
    • Integrate risk analysis outputs into project reporting and executive dashboards.
  • Project Controls & Reporting:
    • Develop and maintain earned value management (EVM) reporting - tracking SPI, CPI, schedule variance, and cost variance
    • Prepare and present project controls reports (weekly, monthly, executive level) including schedule status, risk summary, and forecast-to-complete
    • Develop and maintain integrated project dashboards combining schedule, cost, risk, and quality data
    • Support project closeout activities including schedule analysis, lessons learned, and as-built documentation.
  • Any other duties that required based on priorities by the management.

Skills / Qualifications:
  • Bachelor's degree in Engineering, Construction Management, Architecture, or related field
  • Degree in any engineering disciplines / project management / construction or equivalent.
  • Minimum 10 years of experience in project controls, scheduling, and/or risk management on large capital construction or industrial projects
  • Minimum 5 years in a lead scheduler or project controls leadership role
  • Proven experience on complex projects in semiconductor fab, data center, industrial, or comparable high-tech construction environments preferred
  • Strategic thinking with strong analytical and problem-solving skills
  • Excellent communication and executive presentation skills
  • Ability to lead cross-functional teams and influence without direct authority
  • High attention to detail with strong data integrity standards
  • Adaptable and resilient in fast-paced, dynamic project environments
  • Results-oriented with a continuous improvement mindset
  • Proficient in:
    • MS Office (Words, Excel, Powerpoint, Project),
    • Project Control platforms: Primavera P6, Acumen Fuse, Smart PM, Procore, Autodesk Forma, Autodesk Revit
    • Automation dashboards software (Power BI, Power Automate)

About Micron Technology, Inc.
We are an industry leader in innovative memory and storage solutions transforming how the world uses information to enrich life for all . With a relentless focus on our customers, technology leadership, and manufacturing and operational excellence, Micron delivers a rich portfolio of high-performance DRAM, NAND, and NOR memory and storage products through our Micron® and Crucial® brands. Every day, the innovations that our people create fuel the data economy, enabling advances in artificial intelligence and 5G applications that unleash opportunities - from the data center to the intelligent edge and across the client and mobile user experience.
To learn more, please visit micron.com/careers
All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, veteran or disability status.
To request assistance with the application process and/or for reasonable accommodations, please contact [email protected]
Micron Prohibits the use of child labor and complies with all applicable laws, rules, regulations, and other international and industry labor standards.
Micron does not charge candidates any recruitment fees or unlawfully collect any other payment from candidates as consideration for their employment with Micron.
AI alert: Candidates are encouraged to use AI tools to enhance their resume and/or application materials. However, all information provided must be accurate and reflect the candidate's true skills and experiences. Misuse of AI to fabricate or misrepresent qualifications will result in immediate disqualification.
Fraud alert: Micron advises job seekers to be cautious of unsolicited job offers and to verify the authenticity of any communication claiming to be from Micron by checking the official Micron careers website in the About Micron Technology, Inc.

Micron Technology Singapore, Singapore, SGP Office

1 Woodlands Ind Park D St 1, Singapore, Singapore, 738799

Micron Technology Singapore, Singapore, SGP Office

1 N Coast Dr, Singapore , Singapore, Singapore, 757432

Similar Jobs at Micron Technology

Entry level
Artificial Intelligence • Hardware • Information Technology • Machine Learning
The Engineer for Product Development will evaluate new equipment, integrate AI tools for efficiency, and manage supplier engagement while supporting continuous improvement initiatives.
Top Skills: Ai-Assisted ToolsAutomationDigital FluencyInternet Of ThingsProcess Control System
9 Hours Ago
In-Office
Singapore, SGP
Mid level
Mid level
Artificial Intelligence • Hardware • Information Technology • Machine Learning
The role focuses on designing, developing, and maintaining automation solutions for factory operations, improving productivity and system efficiency through collaboration with teams and data analysis.
Top Skills: AIAngularCSSGoogle Cloud PlatformHTMLLinuxMachine LearningPerlPower BIPythonSQLTableau
9 Hours Ago
In-Office
Singapore, SGP
Mid level
Mid level
Artificial Intelligence • Hardware • Information Technology • Machine Learning
As a Validation Engineer, you will develop and execute validation test plans for SSD devices, analyze results, and assist in debugging. You will also perform failure analysis and enhance customer integration experiences.
Top Skills: LinuxNvmePcieWindows

What you need to know about the Singapore Tech Scene

The digital revolution has driven a constant demand for tech professionals across industries like software development, data analytics and cybersecurity. In Singapore, one of the largest cities in Southeast Asia, the demand for tech talent is so high that the government continues to invest millions into programs designed to develop a talent pipeline directly from universities while also scaling efforts in pre-employment training and mid-career upskilling to expand and elevate its workforce.

Sign up now Access later

Create Free Account

Please log in or sign up to report this job.

Create Free Account